2027年3月5日閲覧. ^ a b -21レイダー生産率を 25%増やし,年間8機の爆撃機と,エルスワースAFBに2027発の配備を目指す.
The U.S. accelerates B-21 Raider production by 25% with $4.5B, targeting eight bombers yearly and 2027 deployment at Ellsworth AFB.
米国空軍とノースロップ・グリムマンは,毎年8機の爆撃機を派遣し,南ダコタ州エルスワース・AFBに派遣する目的で,B-21レイダー生産の増加に合意した.
The U.S. Air Force and Northrop Grumman have agreed to boost B-21 Raider production by 25% using $4.5 billion in funding, aiming to deliver up to eight bombers annually and begin operational deployments at Ellsworth AFB, South Dakota, by 2027.
加速は,規律正しく取得する努力の一環であり,コストと性能の制御を維持しつつ,世界的な脅威が広がっている中で長期的攻撃能力を強化する.
The acceleration, part of disciplined acquisition efforts, maintains cost and performance control while strengthening long-range strike capabilities amid evolving global threats.